Log Book for April 18, 2008
Commander's Check-In
Henrik Hargitai Reporting
Commander's Check-In Report
April 18, 2008
Henrik Hargitai
Crew Physical Status: Good
Time Departed/Returned from EVA: EVA10 1100- (not returned at the time of the report being written, expected during/after com window)
Brief Narrative of Field Mission Results: EVA10 is to take the mission Geologist to the launch pad of a Greyhound type rocket to Paris, in pressurized rover and also to visit Goblin Valley.
Hab Maintenance: Generator problem during the morning: wires from the main generator had contact problems. Fixed. We used the secondary generator, it worked. Flooding from primary greywater tank - water in secondary tank was full: we have pumped it out, solving the problem.
Report Transmission Schedule: Not in time as crew is on a day-long EVA10.
Plans for Tomorrow: HUSAR2d rover deploying; uploading new version of software for the meteo station (fixing power problems)
Inventory: no significant change
Support Requested: None
|
|
|