Log Book for May 5, 2003
General Engineering Report
Joan Roch & Simone Kosol Reporting
Generator/Electricity: Main generator checked at 8:30 and 20:50. Ran without problem today, but still suffers from an oil leak. Maintenance from the outside is expected in the next few days.
08:30 Check:
Run time: 3439.1 hrs
Oil added: 1.5 quarts (after 15 hours)
North tank: 20 (in use)
South tank: 86 (not in use)
20:50 Check:
Run time: 3451.4 hrs
Oil added: 2.0? quarts (after 12 hours)
North tank: 16 (in use)
South tank: 86 (not in use)
Computers / Networking: network is up, Internet is available, printer works.
Water: internal tank refilled at 20:00 from 19 to 55 Gal.
GreenHab:
08:30 Check: (by mutants)
temp at north door: 74°F in, 64°F out, 55%
min/max temp./hygrometer at shelf: 48°F/79°F; 22%/37%
current temperature/humidity: 79°F/27%
mercury thermometer at south door: 72°F
12:00 Check: (EVA-9)
temp at north door: 98°F in, 59°F out, 40%
min/max temp./hygrometer at shelf: 77°F/100°F; 15%/26%
current temperature/humidity: 100°F/18%
mercury thermometer at south door: 88°F
20:45 Check: (by mutants)
temp at north door: 58°F in, 52°F out, 46%
min/max temp./hygrometer at shelf: 64°F/111°F; 10%/18%
current temperature/humidity: 64°F/18%
mercury thermometer at south door: 62°F
Next Report: 05.06.2003, in the evening
|
|
|