Log Book for May 4, 2003
General Engineering Report
Joan Roch & Simone Kosol Reporting
Generator/Electricity: Main generator checked at 11:30 and 20:30. Ran without problem today, but still suffers from an oil leak. Maintenance from the outside is expected in the next few days.
11:30 Check:
Run time: 3418.4 hrs
Oil added: 1.5 quarts (after 15 hours)
North tank: 24 (in use)
South tank: 86 (not in use)
20:30 Check:
Run time: 3427.2 hrs
Oil added: 1.5 quarts (after 9 hours)
North tank: 21 (in use)
South tank: 86 (not in use)
Computers / Networking: network is up, Internet is available, printer works.
Water: internal tank refilled at 20:00 from 29 to 55 Gal.
GreenHab:
11:30 check: (by mutants)
temp at north door: 86°F in, 66°F out, 45%
min/max temp./hygrometer at shelf: 52°F/97°F; 16%/37%
current temperature/humidity: 90°F/17%
mercury thermometer at south door: 76°F
20:30 check: (by mutants)
temp at north door: 65°F in, 58°F out, 46%
min/max temp./hygrometer at shelf: 68°F/109°F; 11%/22%
current temperature/humidity: 68°F/22%
mercury thermometer at south door: 64°F
Next Report: 05.05.2003, in the evening
|
|
|