Log Book for May 3, 2003
General Engineering Report
Joan Roch & Simone Kosol Reporting
Generator/Electricity: Main generator checked at 08:00 and 20:20. Ran without problem today, but still suffers from an oil leak. Maintenance from the outside is expected in the next few days.
08:00 check:
Run time: 3391.0 hrs
Oil added: 1.5 quarts (after 11.5 hours)
North tank: 31 (in use)
South tank: 85 (not in use)
20:30 check:
Run time: 3403.1 hrs
Oil added: 1.5 quarts (after 12 hours)
North tank: 28 (in use)
South tank: 87 (not in use)
Computers / Networking: network is up, Internet is available, printer works.
Water: internal tank refilled at 20:00 from 22 to 55 Gal.
Grey water: at 18:40, refill of tank for toilet flush with grey water from dishwashing and basin in shower room.
GreenHab:
08:00 check: (by mutants)
temp at north door: 79°F in, 62°F out, 45%
min/max temp./hygrometer at shelf: 55°F/86°F; 10%/18%
current temperature/humidity: 84°F/10%
mercury thermometer at south door: 71°F
14:45 check: (EVA7)
temp at north door: 80°F in, 76°F out, 35%
min/max temp./hygrometer at shelf: 82°F/100°F; 12%/18%
current temperature/humidity: 91°F/14%
mercury thermometer at south door: 79°F
20:30 check: (by mutants)
temp at north door: 64°F in, 59°F out, 40%
min/max temp./hygrometer at shelf: 66°F/97°F; 12%/17%
current temperature/humidity: 66°F/17%
mercury thermometer at south door: 62°F
Next report: 05.04.2003, in the evening
|
|
|