Log Book for May 1, 2003
General Engineering Report
M. Moran, J. Roch, & S. Kosol Reporting
Generator/Electricity: Generac checked in morning and evening today. Ran without problem today, but continues to suffer from an oil leak.
08:35 check (out of sim)
Runtime: 3343.8
Oil Added: 1.3 quarts
North Tank: 40
South Tank: 84
20:02 check (out of sim)
Run time: 3355.1 hrs
Oil added: 1.5 quarts
North tank: 40
South tank: 85
Computers / Networking: network is up, Internet is available, printer works.
Water: We refilled the internal tank at 20:00 from 30 to 55 Gal. Averagewater use for showering estimated at 3 Gal/person.
Grey water: we refilled the toilet flush tank with grey water from the under-counter bucket in the shower room at 16:30.
GreenHab: Checked out-of-sim in morning, during daytime EVA, and out-of-sim
in evening.
08:32 check (out of sim)
at door: 72°F left/ 66°F right
min/max temp./hygrometer at shelf: 45°F/72°F and 19 %/38%
current temp./humidity 70°F/32%
Mercury thermometer at south door: 67°F
14:41 check (in sim)
at door: 107°F left, 74°F right
min/max temp./hygrometer at shelf: 70°F/117°F and 10%/32%
current temperature/humidity: 111°F/10%
Mercury thermometer at south door: 100°F
20:03 check (out of sim)
at door: 72°F left, 62°F right
min/max temp./hygrometer at shelf:
75 F/111 F and 10%/21%
current temperature/humidity: 75°F/18%
Mercury thermometer at south door: 70°F
|
|
|