Log Book for March 7, 2003
General Engineering Report
Matt Bamsey Reporting
Generator/Electricity: Check carried out early this morning - Hobbs meter measured 2663.1 hrs.
Propane: At 0615 hrs the tanks measured: South 55%, North 20%, Furnace 65%.
Water: Internal tank filled 2300 hrs (yesterday) from 15-56 gallons. Today's refill to occur later this evening.
GreenHab: No progress made.
Everest Rover: Repaired the sheet metal casing on the rear of the grey water tank. Bent the damaged ladder back into line and prepared to its re-integration this coming weekend when a Everest team member from the University of Michigan arrives at the hab. The generator will also be delivered.
ARES Rover: No progress made.
Datalogger: Figured out way to integrate Datalogger with MDRS suit.
|
|
|