Log Book for February 25, 2003
General Engineering Report
Matt Bamsey Reporting
Generator/Electricity: Still running on the backup generator. Generator refilled at 0710 hrs and again at 1300hrs. Another refueling was carried out at 2040hrs. Note these were not complete fills. Awaiting governor control board delivery for main generator repair tomorrow.
Propane Tanks: Furnace tank read 76% at 2040 hrs.
Water: The water tank was refilled from 7 to 54 gallons at 2035 hrs.
Additional Activities: Work bench area was cleaned an reorganized. A plastic guard and new labels were installed around the switch for the pump for interal water tank filling. Email describing fix including images to come.
Datalogger was supported for a number of EVAs. The support includes readying it for use as well as troubleshooting. During one EVA one of the dataloggers required a reboot as well as a battery exchange.
A hinge was fastened to a plexiglass panel for installation in the ARES glove box.
|
|
|