Log Book for February 22, 2005
Refit Report
Collator: Anthony Francis
Contributors: Paul, Artemis, Kevin, Adam, Felipe and Hugh
Engineering Refit:
- New water supply installed - Paul, Kevin, Hugh, Adam, Felipe
- Moved tank back to utility area - Paul, Kevin, Hugh, Adam, Felipe
- Water Supply Debugging - Paul, Kevin, Hugh, Adam
- Water supply switch installed - Paul
- Additional exterior plumbing installed - Paul
- Final Switch Cleanup and Remote Test - Artemis
- Shower upgrade - Paul
- Hot air vent
- Wiring clampdown
- Suit repair - Artemis
- Old repairs removed
- Iron-on patches installed
- Uniform repair sewing completed
- Post-Smurfage (Switch Installation) - Artemis
- Wiring Box Closure - Kevin
- Bathroom duct installation - Kevin, Adam, Felipe
- Graywater Upgrades - Paul (with Anthony on flashlight duty)
- Sealed backflow pipe from tank 5
- Rewired power connections for pump
- Sealed cap to graywater enclosure
- Greenhab Upgrades - Paul (with Anthony on flashlight duty)
- Connected gas lines
- Removed nonfunctioning copper power lines
- Installed new junction box
- Attached new d/c power connnections
- Added L/P Monitor
- Moved power couplings inside greenhab tank room
- Corrected bubble tube issues
- Water System Debugging - Paul (with Anthony on flashlight duty and support from Artemis, Hugh)
- Automated pump failure issues
- Graywater enclosure issues
- Aft airlock inner door seal correction - Paul
- Power box rewiring and cleaning - Paul
- Digital Punch List recording - Paul, Anthony
- MDRS, Greenhab, Antartica, Power/Gas Systems
Housekeeping Tasks:
- Front Airlock Cleanup - Hugh, Anthony
- General cleanup
- Front step cleanup
- Movement of ducting to overhead storage
- Engineering Room Cleanup - Felipe, Adam, Kevin, Paul
- General cleanup
- Organized equipment
- Materials moved back to new storage area
|
|
|